Warehouse & Logistics Centre Coesfeld
Store, chill and handle
At our Coesfeld site we bring dry, chilled and frozen space, order picking and handling together under one roof — available individually or as a complete facility.
One site, every temperature
Two halls, a cold store, an office building and the handling zone across 7,517 m² — grown over time and with an approved expansion stage.
View online or download
The site presentation
All areas, temperature zones, floor plans and the approved expansion — six pages as a PDF.
Site plan, zone layout and escape-route plan Floor plans for building 1 and building 2 Areas, temperatures and pallet spaces per zone Sections, elevations and the approved expansion stage
This presentation is available in German only.
We are happy to answer your questions about space and terms in English.
Temperature-controlled
Zones you can combine
Chilling, freezing, dispatch and order picking — rent them individually or as an unbroken chain.
Chilled storage
0 to +4 °C
600 m² with satellite racking and 650 pallet spaces for fresh goods.
Frozen storage
−18 °C
600 m² with satellite racking and 650 pallet spaces, rated down to −25 °C.
Dispatch & handling
Goods-in +7 °C · dispatch hall +2 °C
Short distances between storage, order picking and the loading docks — predictable and fast.
Order picking
+10 °C
Distribution and order picking in a temperature-controlled area.
Buildings & areas
What is available on site
Building 1 · Part B
Offices & administration
280 m²Built 1996, fully air-conditioned, new gas heating Welfare facilities, showers, WC and staff room 15 car parking spaces
Building 1 · Part A
Temperature-controlled hall
1,700 m²Divisible into 600 m² (0–4 °C), 600 m² (−18 °C) and 500 m² (+7 °C) Satellite racking with 650 pallet spaces per area Steel frame with sandwich panels, built 1996, 7 m in height
Dispatch cold store
Chilled dispatch
230 m²230 pallet spaces at 0 to +4 °C Offered together with building 1 · part A Steel frame with sandwich panels, built 2002
Building 2
High-bay dry storage
1,720 m²Built 2006, 16.2 m internal height, LED lighting, 2 loading docks 3,600 pallet spaces, up to 7,600 with satellite racking Racking can be removed — conversion to production space is possible
The site is owned by Henric Wolfram Verwaltungs GmbH.

Facilities on site
- Dry storage
- Chilled storage
- Frozen storage
- Handling zone
- Laboratory
- Workshop
- Diesel filling station
- Biogas
- Staff accommodation
- Parking areas
- Truck charging points (planned)
Security & access
Alarm-protected CCTV-monitored Fire-protected IFS Food Defence Controlled access Turnstile
Planning permission granted
The next expansion stage is approved
Expansion to 14 loading docks 1,200 m² chilled dispatch 8 m internal height
Scheduled for 2028. These figures describe the approved plans, not what stands on site today.
Looking for space? Talk to us.
Whether a single chilled area, a whole hall or the complete facility — we will develop the right solution for your needs.


